BP continues to drill two relief wells as part of a longer term plan to control the leak. The first relief well has reached a depth of 12,090 feet, while the second relief well was at 8,576 feet (June 1, 2010). The wells are expected to be completed in August. (msnbc, 6/1/2010)
The Center, founded in 1985, is an environmental organization dedicated to protecting the environment, enhancing human, animal and plant ecologies, promoting the efficient use of natural resources and expanding participation in the environmental movement.
Tuesday, June 01, 2010
Lower Marine Riser Package (LMRP)
BP lastest plan plans is to cut away the existing, damaged riser at the head of the pipe outlet on the sea floor and deploy a cap called a lower marine riser package (LMRP). BP will cut with super sheers that weigh 46,000 pounds and resemble a giant garden tool. The company will also use a powerful diamond-edged cutter the resembles a deli slicer to try to make a clean cut above the blowout preventer, then will lower a cap over it with a rubber seal.
No comments:
Post a Comment